Tuesday, 1 May 2018

The flooring...

So excited for today as we wait for some progress photos from our flooring guys here who are starting on the flooring today yay :)

Tii (our sales rep) kept me informed of what the guys were up too as well as sending some snaps on how it was coming along.

Of course and as to be expected, nothing ever goes to plan and they certainly hit some road bumps with the foyer steps!

Since they were going to start with the stairs, Ben had told Geoff yesterday that he wanted them to hold off on doing them today since he's going to be going up and down them all day doing the electrical and didn't want to be disrupting their progress so asked if I could get them to start somewhere else for the day and so I did

I digress! Now to get back to where I was in the beginning, the first bump was as I said, the foyer step...let me remind you of what it looks like...(the brick one)


see how the moulding goes down to it a fair way? Well, apparently (according to the chippie that we spoke to the Saturday just gone) the skirting doesn't go on that step, hence how low the that moulding is and how big the skirting is!

So the dilemma is, when they put the flooring down, there's a massive gap in the gyprock which won't cover the edge of the timber on the left side which leaves us with either, needing to put quad to cover it or we try to cut down the size of the skirting (which will look odd) and put it under the moulding to cover it or, get the chippie to remove the bottom moulding, shorten the sides enough so the skirting can go back on and then replace the bottom moulding again!

In my head, I'd so much rather the last option and believe it to be the best one for consistency

So after letting Tii know of what we'll get done, they continued the rest so they could start the stairs so that Ben could work on the outside electrical


Here's what he sent through last night...

The foyer steps

Can you just imagine how it'll look when the skirting goes back on?

From the foyer looking into the guest bed


The study

Looking back at the front porch

Looking at the stairs from the Theatre Room

The Cellar from the kitchen/family room entry


From the stairs looking towards the foyer


Look at how the top step looks seamless, you would think it was just 1 step down but in fact, it's 2 ahhhhh.....love it! 




Monday, 30 April 2018

The Last Leg...

As we near the end, Ben the sparky was on site as promised to start the electrical fix out before the flooring guys started the next day. Since we were supplying all the electrical, Geoff went up to make sure Ben had all that he needed and whilst there, spoke to the SS to tell him to re do the mirrors and get the glass in the main shower cut down. The SS wasn't too happy about the replacing the mirrors and kept saying that they are the ones 'WE' ordered which is total crap!

We also discovered that the space where the outdoor fridge will go in the outdoor kitchen is now too low with the tiles under and unfortunately we can't adjust the height on either  the fridge or the bench so we're going to have to buy a new one...grrrr

Geoff face timed me (I was at home getting ready for work) to show me the lights so far and boy was I excited. Ben must've got up there at the crack of dawn with all that he had done so far! I mean, Geoff got there around 7ish which I thought was early enough and certainly didn't expect anyone on site until after that!

Most of the downlights were installed (ground floor), my kitchen pendants, dining room pendants and even a fan in the family room had been done and....some switches and power points! Pretty good effort I thought

Take a look...















Saturday, 28 April 2018

Almost done..

As we're nearing the end, I had word from the SS that the hand over date will be Friday the 11th May woohoo

With only a few more things to be done...the fiddley bits, we are almost at completion and following my calendar, it'll be 40 weeks of construction

We are extremely happy with the quality of the build and lucky for us, if something needed fixing or replacing, they did it straight away which is sooooo much better than waiting to do it at the last minute and possibly holding off on the hand over!

The electrician will start with the fitting of the lights and all the switches and GPO's (power points) on Monday so that he isn't going to be in the way of the flooring going down on Tuesday. Then he'll probably continue the following couple of days upstairs so the guys can continue the flooring downstairs so they can finish up on Thursday

Then once the flooring is in, the chippies can come back and put the skirting back on so the painters can finish off with both that and the final bits of moulding

It looked like they had been back to do another coat of paint in the theatre room...woohoo now I don't have too :)
They gave the front doors their final coat too and they look amazing. The kitchen guy has been back too 'cos I noticed my glass doors were back on again and with the glass inserts!

The shower screens are in along with the mirrors....now this is a sore subject at the moment! As soon as I seen the mirrors I thought "What tha" they're way too small and certainly not the size I asked for! So we are getting them replaced quick sticks!

We both agreed that the shower screen in  the main bathroom is way too big and will need cutting back. When we measured it off with the SS, the bath wasn't in so we went gun ho on what the size should be and of course didn't even consider how much it would interfere with the walk way past the bath. So a big mistake on all accounts


Can't wait until they clean up and take those awful stickers off the windows

In love with the colour 'Domino'




Hoping the colour of the handrail (Black Japan) won't be too dark for the flooring and will be a nice contrast

Love looking down from the stairs and can't wait for the iron work to go on the cellar door

the mirror and glass shelf has been installed




the chippie has come back to finish off the rest of the moulding

Painters have put a 3rd coat on





Last shelf installed






Glass doors back on 



This is where the TV was going but we changed our mind and put it on the left wall instead. I'll get Ben (no 1 son) to put a floating shelf here

Guest Ensuite

See what I mean about the mirror being way too small

Powder room

Master Ensuite

Main Bathroom


Shower screen way too big :( if  we could've moved the bath further down the other end, it would be fine, but too late now!


Wednesday, 25 April 2018

Still Getting Closer...

Anzac Day 

We had to go up to the house so that Geoff could wire up the outdoor power points for the Envirocycle and Water Tank and as usual, I had a sticky at what the painters were up to and wasn't disappointed

They're all but finished but will obviously need to come back once the flooring is down to paint the skirtings

Not long now until hand over, I scribbled down what I thought was still to be done to which one would assume there would only be a couple of weeks involved...we'll see!

1. Door Handles
2. Kitchen drawer replaced, glass shelving and doors installed, handle on bin pull-out, face on dishwasher (fully integrated) 
3. Flooring (starting 1st May)
4. Skirting put on
5. Skirting painted
6. Balcony rail install
7. Toilets hooked up
8. Mirrors and shower screens installed
9. Electrical fix out
10. Clean up both inside and out
11. Carpet Install
12. Iron bars on cellar door
13. Gas fire fitted
14. BBQ installed

So not much really and most of it is the fiddly stuff




Doors need a 2nd coat but looking great


How good does the entrance look



Looking towards the Guest Bedroom from the Entrance
Looking towards the Study and Entrance from Guest bedroom
Loving the detail of the stairwell


Looking at the stairwell from the Theatre Room


Will be adding the moulding to the Rumpus as well...this room will be used as the Formal Dining now

Family room

The Theatre room has had a 2nd coat but may need a 3rd on the ceiling!

The worst of going with a darker paint colour...shows up all the flaws in the gyprock and plaster :(


Definitely needs a 3rd coat

Powder room even gets the moulding and skirting not tiled skirting! 


My scullery

Shelves have finally been installed in the pantry! Still need to put the bottom one on
Can't wait to see the appliances in and the timber flooring against the white!

Now we're in