Showing posts with label Beaumont Tiles - Marvel Pietra Charcoal. Show all posts
Showing posts with label Beaumont Tiles - Marvel Pietra Charcoal. Show all posts

Saturday, 24 March 2018

Leading up to Easter


The week leading up to Easter, the tilers were out on site finishing what they could as they were still waiting on the kitchen tiles to arrive. The carpenters had installed all the doors and did the architraves and skirting however, I noticed that they had put the wrong doors in the foyer and Theatre room. These should be swapped around! The Cellar door is on but am awaiting the ironwork which hopefully will be installed after the Easter break.
Ben (# 1 son) is coming up on good Friday (next Friday) to install the theatre platform...soooo can't wait
Geoff is getting used to the tiles in the laundry though is still waiting to make final judgment when it's all finished and we're finally in!

We've been trying to get a final date for hand over from the SS but he' s hesitant and keeps saying "I'll let you know next week"!

The kitchen benchtops have been put on as well as the outdoor kitchen and I am happy with the choice and cant wait to see how all the appliances look once they're in

I decided to do away with the niches in the ensuite after all as they were going to be at tile height. I have always said that they were put in too low but the SS didn't relay it back to the carpenters until the tilers came and by that time, it was too late to move them higher grrrrr
I did however decide to keep the one in the main bathroom, it didn't look too bad and now that it's fully tiled, it looks pretty good to me (forgot to take a pic of it) and will do
 Some more painting had been done though I really don't know why they keep coming and going, they should just wait until everything's done and finish it off in one go!

I'm a little unsure whether I like the capping in the bathrooms, I guess I will have to wait and see how it looks once everything is completed before I judge and if I don't like it then, I can probably just take them off?























Friday, 16 March 2018

Tiling almost complete

We went up to the house to see what had been done through the week and a lot had been done. The tilers continued on the wet areas and are all but finished with most of the walls in the showers.

The painters look like they've been back to do some more undercoating and they've even managed to finish off the gables

The glass had been installed in the bi fold doors which is a sign that we're almost at lock up!

Not sure why they've painted the theatre room the same colour as everywhere else, this room is suppose to be Dulux Domino so I would've expected a darker undercoat!

The stone tops had been installed except for the wine cellar and kitchen which is probably next week's job


Powder room

Guest Ensuite. Tiles almost complete and vanity top is in



Stone tops installed in Scullery

Tiling continued on backsplash in Laundry

Master Ensuite - Stone top installed and tiling almost complete

Main bathroom shower recess

Main bathroom stone top installed

Master ensuite shower recess

Master Ensuite Vanity

Void

Cellar bar top to be installed

Bi fold doors are now complete

Family room fire place

Theatre Room

Loving the Vanilla Noir Stone Tops



Gables Painted and downpipes installed



Now we're in