The painters look like they've been back to do some more undercoating and they've even managed to finish off the gables
The glass had been installed in the bi fold doors which is a sign that we're almost at lock up!
Not sure why they've painted the theatre room the same colour as everywhere else, this room is suppose to be Dulux Domino so I would've expected a darker undercoat!
The stone tops had been installed except for the wine cellar and kitchen which is probably next week's job
Powder room |
Guest Ensuite. Tiles almost complete and vanity top is in |
Stone tops installed in Scullery |
Tiling continued on backsplash in Laundry |
Master Ensuite - Stone top installed and tiling almost complete |
Main bathroom shower recess |
Main bathroom stone top installed |
Master ensuite shower recess |
Master Ensuite Vanity |
Void |
Cellar bar top to be installed |
Bi fold doors are now complete |
Family room fire place |
Theatre Room |
Loving the Vanilla Noir Stone Tops |
Gables Painted and downpipes installed |