Friday 30 March 2018

Theatre Platform

Ben (#1 Son) came up to install the theatre platform today and wow what a star. He done an excellent job with the help of my handy hubby at the helm and in that awful heat none the less

We had previously asked the SS to leave a window open or one of the doors unlocked for us to which he said not a problem. Problem was, he didn't let us know where he hid the darn thing so Geoff ended up having to climb up to the bedroom upstairs (lucky the window was open) to open the front door.

Since we couldn't find the key (it was hidden in the drawer in the outside kitchen), and having all the back locked up, it pretty much felt like an oven once the heat of the day was on top of us. What was 30 degrees outside, felt like 50 degrees inside...yuk!

We get a great breeze through the house when the front and back are all open!

The G-kids got a little flustered by the afternoon so Ze and I took them down to the river for a dip and tired them out lol

By the late afternoon, we all packed up and headed for home, ordered some pizzas, had showers and sat around having a lovely chat and admiring Ben and Geoff's work .

Here's the final outcome...300mm high x 4800mm wide x 2100mm deep with 2 side steps at 150mm high x 900mm wide and 300mm deep




No comments:

Post a Comment

Now we're in